Machine Q Lora Area

Machine Q Lora Area

Gateway (ODM Project)

Duration: 8 months

Process: RFQ to MP

Brand: Machine Q, A Comcast company

Work at: Sercomm

In this project, I was responsible for both the industrial design (ID) and mechanical engineering (ME) tasks during the RFQ stage with our client, Machine Q. Once the NPI phase began, I shifted my focus to industrial design and CMF.

Internal PCB Layout and stacking

At Sercomm, ID is responsible for both ID and ME tasks before NPI stage, so i was obligated to do all the assesment including internal stacking, PCB outline drawing, mechanical design and tooling assesment.

Proposing ID/ME changes to Manchine Q

Tooling samples review, assembly check and tracking

Led DFM reviews with suppliers, reviewed tooling samples, monitored tooling progress across each development stage, and defined golden and limit samples for client approval.

Wisarut Aroonkayan │ Yuh Shyan Lin

Email: Wisteinlin@gmail.com

Cel: +886 953-663-906

©2026 Wisarut Lin. All right reserved.